It was a rather challenging demo of the old doors. First the door trim was removed, then I cut the old door frame and pried it out.
Once we have the rough openings ready, the new door and frame are set in place, leveled, shimmed into place and screwed into the walls. Now the trim goes back on and the gaps are caulked. Here's the finished front door with the old door in the foreground. We still need to paint the trim white to match.
Here the trim on the back door gets nailed into place.
There's some touch-up and caulking to be done on the outside also. Hope to get this done next weekend.